×
PHI News

18

Feb

PT Pertamina Hulu Indonesia Launches SWA Card at the Peak of the 2026 National OHS Month Commemoration

Jakarta – PT Pertamina Hulu Indonesia (PHI) officially launched the Stop Work Authority (SWA) Card, which grants every worker the authority to stop a job if unsafe behavior or conditions are identified, without fear of it affecting their individual performance appraisal. The launch of the SWA Card took place at the closing of the 2026 National Occupational Safety and Health (OSH) Month/Bulan Keselamatan dan Kesehatan Kerja (K3) Nasional 2026 commemoration held in Jakarta on 13 February.

13

Feb

Supporting National Energy Security, PT Pertamina EP Sangasanga Field Records Positive Performance at the Beginning of 2026

Sangasanga –  PT Pertamina EP (PEP) Sangasanga Field recorded a positive performance at the beginning of 2026, exceeding the Company’s target at 104.02 percent of the Corporate Work Plan and Budget (RKAP) target. With this achievement, PEP Sangasanga Field has maintained the positive production trend seen throughout 2025.

12

Feb

Various Innovations and Technologies Support PHI Group in Zona 9 to Surpass 2025 Oil and Gas Production Target

Balikpapan – PT Pertamina Hulu Indonesia (PHI), through PT Pertamina Hulu Sanga Sanga (PHSS), PT Pertamina EP (PEP) Tanjung Field, PEP Sangasanga Field, and PEP Sangatta Field, recorded oil and gas production realization exceeding the 2025 target. These four subsidiaries and affiliates of PHI in Zona 9 achieved oil production of 22.6 thousand barrels of oil per day (MBOPD), while gas production reached 105.369 million standard cubic feet per day (MMCFD).

06

Feb

Development Well Production Test, PEP Sangasanga Field Achieves Positive Oil Output from Existing Well Area

Kutai Kartanegara – PT Pertamina EP (PEP) Sangasanga Field recorded positive results, with oil production reaching up to 520 barrels per day (bpd) from development well NKL-1183, located in Kutai Lama, Anggana Sub-district, Kutai Kartanegara, East Kalimantan. Drilling activities for Well NKL-1183 took place from December 14, 2025, to January 8, 2026. To date, Well NKL-1183 has demonstrated stable production performance, maintaining output above 400 bpd.

29

Jan

Supporting Local Talent to Pursue Higher Education, PT Pertamina Hulu Mahakam Provides Mahakam Education Assistance and Coastal Graduate Mentorship Program

Samarinda – PT Pertamina Hulu Mahakam (PHM) symbolically handed over education assistance to representatives of students from 15 universities and representatives of coastal graduates at an event held in Samarinda, East Kalimantan, on Wednesday (January 21, 2026). The assistance is part of PHM’s Corporate Social Responsibility (CSR) programs, namely the Mahakam Education Assistance Program (Program Bantuan Pendidikan Mahakam) and the Coastal Graduate Mentorship Program (Program Pendampingan Sarjana Pesisir). In this phase, 99 beneficiaries received educational support.

READ MORE

29

Jan

Strengthening Upstream Oil and Gas Synergy, PT Pertamina Hulu Mahakam Receives Working Visit from Kutai Kartanegara Regional House of Representatives

Kutai Kartanegara – PT Pertamina Hulu Mahakam (PHM) received a working visit from Commission I of the Kutai Kartanegara Regional House of Representatives (DPRD Kabupaten Kutai Kartanegara) to the South Processing Unit (SPU) Field in Anggana Sub-district, Kutai Kartanegara, on Saturday (January 24, 2026). The visit aimed to review in person the management of upstream oil and gas operations and production in the field.

READ MORE

Copyright PT Pertamina Hulu Indonesia 2026. All Rights Reserved.