12
Feb
Balikpapan – PT Pertamina Hulu Indonesia (PHI), through PT Pertamina Hulu Sanga Sanga (PHSS), PT Pertamina EP (PEP) Tanjung Field, PEP Sangasanga Field, and PEP Sangatta Field, recorded oil and gas production realization exceeding the 2025 target. These four subsidiaries and affiliates of PHI in Zona 9 achieved oil production of 22.6 thousand barrels of oil per day (MBOPD), while gas production reached 105.369 million standard cubic feet per day (MMCFD).
06
Feb
Kutai Kartanegara – PT Pertamina EP (PEP) Sangasanga Field recorded positive results, with oil production reaching up to 520 barrels per day (bpd) from development well NKL-1183, located in Kutai Lama, Anggana Sub-district, Kutai Kartanegara, East Kalimantan. Drilling activities for Well NKL-1183 took place from December 14, 2025, to January 8, 2026. To date, Well NKL-1183 has demonstrated stable production performance, maintaining output above 400 bpd.